Pier 2

LOCATION
Honolulu, Hawaii

 

CLIENT
State of Hawaii Department of Transportation

 

PARTICIPANTS
Abhe & Svoboda, Inc.

 

SCOPE OF WORK
Ultrahigh-Pressure Watter Jetting
Concrete Repair
Abrasive Blasting
Painting

 

VALUE
$4.47 million

 

SCHEDULE
April 2006 - April 2007

Abhe & Svoboda, Inc. completed a major rehabilitation project at Pier 2, which included extensive concrete spall repair & fender replacement. The project was part of a larger project to renovate Pier 2 to meet the need for a modern cruise ship terminal with in Honolulu Harbor.

Work underneath the pier was performed from a barge and floating access platform designed and built by Abhe & Svoboda, Inc. A Conjet robot was utilized for ultrahigh-pressure hydro-demolition in the large flat soffit areas, and jack hammers were used to remove concrete in less accessible areas. The existing coal tar mastic coating was removed by abrasive blasting with coal slag. A new Carbondale epoxy coating was applied. New rubber fenders were also installed.